New Build Villa in Benitachell, Los Molinos
New Build Villa in Los Molinos, Benitachell
New construction system, where quality and speed are combined.
An industrialised system, carried out in the workshop, with impeccable finishes and rapid execution. The final product is a totally finished home with different levels of finishes to be chosen by the client, where the fundamental premise is energy efficiency, quality in design and comfort of the home.
A PROJECT
The in-house arquitect carries out and supervises the project in which the client demands. Studio where architecture and interior design are combined.
A REALITY
Together with the company, which specialises in industrialised housing construction, the client will get his home in 6 months.
ADVANTAGES
HIGH QUALITY CONSTRUCTION AND FINISHES
When the construction is carried out in the workshop, the quality is much higher, as the pieces are made by means of machinery with tailor-made work and not by personnel on site. Once the project has been drawn up with BIM systems, the information goes to the factory where all the parts that make up the whole building are disassembled and assembled on site. During the drafting of the project, a study is made to measure of the client, accompanied by technique throughout the process according to the needs and requirements of the client, where you can choose from a wide variety of finishes and qualities.
REDUCTION OF CONSTRUCTION TIME AND COST CONTROL
The start of the work is divided into two important parts, civil engineering and industrialised construction. While everything necessary is being done on site in terms of land preparation, connections, foundations, etc., everything necessary to assemble the building, including installations, finishes, etc., is being done in the factory. Therefore, the industrialised system allows us to construct the building in a short time and to control absolutely all the costs without any unforeseen events during the execution of the project.
IMPROVEMENT OF THE ENVIRONMENTAL IMPACT DURING AND AFTER CONSTRUCTION
As it is a dry and industrialised construction, which is carried out in a workshop, it does not produce an environmental impact in the place where the building is located, avoiding large amounts of dust, transport costs or other contaminants typical of traditional construction. The construction, made with natural materials in its great majority, also reduces the environmental impact. The system used in industrialised construction is much more efficient in terms of acoustic and thermal insulation, which leads to considerable energy savings, i.e. with less electrical energy we can air-condition all the spaces in the building.
INTEGRAL SERVICE
We carry out all the procedures, projects and interior design project, from the idea, until it becomes a reality with the completion of the work. What we call a FULL DESIGN.
HOW DO WE DO IT?
INFORMATION GATHERING
We carry out a study of the client's characteristics as well as tastes and affinities. We listen to their premises, to know how they want to live.
THE IDEA
With the information collected we develop the idea more thoroughly so that the client can understand it. Thanks to the technological advances we have at our disposal, its visualization is as close as possible to reality.
PROJECT
We prepare the project based on optimal quality parameters. All the components are defined with a view to ECO-ARCHITECTURE, for a responsible and environmentally committed operation of the building. The client is offered the possibility of an integral service including the interior design of the house (finishes, lighting, furniture, etc.)
WORK
We monitor the implementation of our buildings closely through our PROJECT MANAGER service. We take care of every detail in the design of the work. As a result, buildings of the highest quality.
VENTILATED REINFORCED CONCRETE FOUNDATION SLAB ACCORDING TO STRUCTURAL CALCULATION OR SANITARY SLAB ACCORDING TO THE RESISTANCE OF THE GROUND AND THE TYPE OF BUILDING.
It includes cleaning and clearing the site, excavating trenches for foundations, as well as excavating trenches for the passage of utilities (sewers, electricity, water connections, etc.), soil compaction and cleaning concrete on which the foundation shoe, made of HA-25 reinforced concrete, is to be built.
In the case of walls in basements or for ground containment, HA-25 reinforced concrete walls are used with a thickness according to the structural calculations, with the waterproofing plate on the outside of the wall, as well as a plate and a drainage pipe for the perimeter.
Note: The budget is indicative until a geotechnical study is available, connection to the grid is not included.
FACADES AND SLABS
THE STRUCTURE IS MADE USING THE PREFABRICATED WESPANEL SYSTEM
The WES system has been developed to meet the current requirements of the CTE and to achieve the highest possible level of comfort, and is backed by numerous certifications to prove its quality.
Currency exchange
- Pounds: 744.264 GBP
- Russian ruble: 0 RUB
- Swiss franc: 838.526 CHF
- Chinese yuan: 6.825.897 CNY
- Dollar: 942.704 USD
- Swedish krona: 10.384.685 SEK
- Norwegian krona: 10.524.305 NOK
- January 0 €
- February 0 €
- March 0 €
- April 0 €
- May 0 €
- June 0 €
- July 0 €
- August 0 €
- September 0 €
- October 0 €
- November 0 €
- December 0 €